LOCATION: Keystone Generating Station
OWNER: Reliant Energy
DESCRIPTION: Install combination of single, triple and quadruple track, switches, cross over, and road crossing for 9,555 lf of railroad as well as the design and installation of railroad bridge for three tracks spanning 70 lf.
DURATION: March 2008 thru April 2009